BLACKTHORN RESOURCES LIMITED [BTR] - Mumbwa JV Project - High Grade Gold Mineralisation Intersected
Blackthorn Resources Limited (ASX: BTR) (“the Company” or “Blackthorn Resources”) is pleased to announce assay results from drill hole MUM0008BD which was completed as part of the Phase 4 exploration program currently underway at the Company’s Mumbwa joint venture (JV) project in Zambia.
Drill hole MUM0008BD intersected a zone of high grade gold mineralisation and includes the following drilled thickness intervals:
• 6m at 0.81 g/t Au between 1,053m and 1,059m
• 16m at 8.97 g/t Au between 1,073m and 1,089 m, including
• 8m at 14.09 g/t Au between 1,081m and 1,089 metres.
Blackthorn Resources Limited (ASX: BTR) (“the Company” or “Blackthorn Resources”) is pleased to announce assay results from drill hole MUM0008BD which was completed as part of the Phase 4 exploration program currently underway at the Company’s Mumbwa joint venture (JV) project in Zambia.
Drill hole MUM0008BD intersected a zone of high grade gold mineralisation and includes the following drilled thickness intervals:
• 6m at 0.81 g/t Au between 1,053m and 1,059m
• 16m at 8.97 g/t Au between 1,073m and 1,089 m, including
• 8m at 14.09 g/t Au between 1,081m and 1,089 metres.
No comments:
Post a Comment